The programme ran through Sunday, August 16, 2026. Week 0 was pre-program onboarding.

Week Dates Phase Output Status
0 May 11-17 Pre-program Environment setup, initial research, PR #853 merged Done
1 May 18-24 Scaffolding Proposal validation, got TZT hardware Done
2 May 25-31 Audit Methodology, contrast scorecards, 354 screenshots Done
3 Jun 1-7 Audit Layout spacing analysis, region violations Done
4 Jun 8-14 Audit Navigation close-out, contrast PR prep Done
5 Jun 15-21 Design Audit closure, PR #879 scope correction Done
6 Jun 22-28 Implementation 1 PR #879 merged, targeted screenshots, and PR #894 opened for #790 Done
7 Jun 29-Jul 5 Review PR #894 feedback and review-driven pivot record Done
8 Jul 6-12 Review and audit re-evaluation PR #894 attention-cost pivot and navigation method gaps Done
9 Jul 13-19 Audit synthesis Navigation correction, current-source check, and evidence boundaries Done
10 Jul 20-26 Implementation 2 and audit handoff Direction 1 implemented, reviewed, documented, and opened as Draft PR #909 Done
11 Jul 27-Aug 2 Final review and write-up Direction 1 integrated; Direction 2 ready for review Done
12 Aug 3-9 Implementation 3 and review Direction 2 re-review; Direction 3 opened as Draft PR #922 Done
13 Aug 10-16 Final programme review PR #911 complete; Direction 3 review and contribution handoff Done

How it breaks down

Weeks 0-4: audit. Measure everything first. Capture evidence, rank findings by severity, and decide which problems are strong enough to become upstream patches.

Week 5: audit closure and design alignment. Close all four audit axes, correct PR #879 scope after Amigo feedback, and rank implementation targets.

Weeks 6-9: implementation, review, and audit synthesis. Week 6 started with PR #879 merged, then moved into targeted screenshot work and PR #894 for issue #790. Week 7 recorded the review-driven pivot on #894. Week 8 held implementation and re-evaluated the navigation method. Week 9 checked the corrected findings against current source and tests, then presented three small audit-derived directions for selection.

Weeks 10-13: selected implementation and final review. Week 10 turned the selected wallet-summary direction into Draft PR #909, then added review, simulator, CI, TZT, and documentation evidence. The separate QR-keypad collaboration also moved from approved design into an implemented Draft PR. In Week 11, maintainers integrated Direction 1 after a rebase and extracted a shared helper in a follow-up. I opened Direction 2 as PR #911, addressed the first review feedback, and moved it to ready for review. Week 12 added an informal positive re-review for Direction 2. I also opened Direction 3 as Draft PR #922 with simulator, translation, and TZT evidence. In Week 13, I completed the documentation review, the PR #911 rebase and verification, and a full status refresh. Direction 2 is complete with upstream merge pending on August 16. Direction 3 and the separate QR-keypad collaboration remain open Draft PRs for maintainer review. The final summary keeps this later implementation evidence separate from the original findings. Work after August 16 is post-programme contribution rather than an extension of the audit timeline.