Timeline¶
The programme ran through Sunday, August 16, 2026. Week 0 was pre-program onboarding.
| Week | Dates | Phase | Output | Status |
|---|---|---|---|---|
| 0 | May 11-17 | Pre-program | Environment setup, initial research, PR #853 merged | Done |
| 1 | May 18-24 | Scaffolding | Proposal validation, got TZT hardware | Done |
| 2 | May 25-31 | Audit | Methodology, contrast scorecards, 354 screenshots | Done |
| 3 | Jun 1-7 | Audit | Layout spacing analysis, region violations | Done |
| 4 | Jun 8-14 | Audit | Navigation close-out, contrast PR prep | Done |
| 5 | Jun 15-21 | Design | Audit closure, PR #879 scope correction | Done |
| 6 | Jun 22-28 | Implementation 1 | PR #879 merged, targeted screenshots, and PR #894 opened for #790 | Done |
| 7 | Jun 29-Jul 5 | Review | PR #894 feedback and review-driven pivot record | Done |
| 8 | Jul 6-12 | Review and audit re-evaluation | PR #894 attention-cost pivot and navigation method gaps | Done |
| 9 | Jul 13-19 | Audit synthesis | Navigation correction, current-source check, and evidence boundaries | Done |
| 10 | Jul 20-26 | Implementation 2 and audit handoff | Direction 1 implemented, reviewed, documented, and opened as Draft PR #909 | Done |
| 11 | Jul 27-Aug 2 | Final review and write-up | Direction 1 integrated; Direction 2 ready for review | Done |
| 12 | Aug 3-9 | Implementation 3 and review | Direction 2 re-review; Direction 3 opened as Draft PR #922 | Done |
| 13 | Aug 10-16 | Final programme review | PR #911 complete; Direction 3 review and contribution handoff | Done |
How it breaks down¶
Weeks 0-4: audit. Measure everything first. Capture evidence, rank findings by severity, and decide which problems are strong enough to become upstream patches.
Week 5: audit closure and design alignment. Close all four audit axes, correct PR #879 scope after Amigo feedback, and rank implementation targets.
Weeks 6-9: implementation, review, and audit synthesis. Week 6 started with PR #879 merged, then moved into targeted screenshot work and PR #894 for issue #790. Week 7 recorded the review-driven pivot on #894. Week 8 held implementation and re-evaluated the navigation method. Week 9 checked the corrected findings against current source and tests, then presented three small audit-derived directions for selection.
Weeks 10-13: selected implementation and final review. Week 10 turned the selected wallet-summary direction into Draft PR #909, then added review, simulator, CI, TZT, and documentation evidence. The separate QR-keypad collaboration also moved from approved design into an implemented Draft PR. In Week 11, maintainers integrated Direction 1 after a rebase and extracted a shared helper in a follow-up. I opened Direction 2 as PR #911, addressed the first review feedback, and moved it to ready for review. Week 12 added an informal positive re-review for Direction 2. I also opened Direction 3 as Draft PR #922 with simulator, translation, and TZT evidence. In Week 13, I completed the documentation review, the PR #911 rebase and verification, and a full status refresh. Direction 2 is complete with upstream merge pending on August 16. Direction 3 and the separate QR-keypad collaboration remain open Draft PRs for maintainer review. The final summary keeps this later implementation evidence separate from the original findings. Work after August 16 is post-programme contribution rather than an extension of the audit timeline.