Skip to content

Week 07 - Jun 29-Jul 5, 2026

Focus: PR #894 review pivot and next audit opportunity


Current status

  • PR #894 is open for issue #790. It adds a Home Settings shortcut and keeps the exposed options limited to Printer and Encryption, but maintainer review questioned whether that permanent Home item is worth the attention cost.
  • PR #879 remains the completed contrast lane. The Amigo info-panel contrast finding stays as a hardware-guided follow-up.
  • The navigation audit now separates three states: touch-target evidence to keep watching, #790 as a tested but likely parked shortcut, and larger menu-flow questions that still need design work.
  • Maintainers asked for a short list of audit findings or opportunities they can help prioritize. That is the next planning task after responding clearly on PR #894.

What I am watching

The main thing this week is scope control. I rechecked the flow behind #790: Printer is already available before login through Settings > Hardware > Printer, and Encryption is already available through Settings > Encryption. Those changes use the normal stored settings path. That means PR #894 mostly helps the narrower case where someone has already loaded a wallet and wants to avoid restarting.

I am treating the next lane as a design choice before it is an implementation task. Some findings can become code directly. Others need a short design note, example screen, review checklist, or device-testing plan first.

This week

  • Respond to review feedback on PR #894 and be clear that closing or parking it is fine if the fallback case is too narrow.
  • Keep the PR wording and screenshots focused on what was tested, not as proof that the shortcut must ship.
  • Prepare a short prioritized list of audit findings/opportunities for maintainer input.
  • Turn the selected opportunity into the smallest useful next step: a PR, design note, example screen, review plan, or device-testing pass.