Focus: Audit closure and PR #879 review follow-up
What I did¶
- Closed the four audit axes before starting any new implementation lane.
- Corrected the contrast PR scope after Amigo hardware feedback. PR #879 now preserves the existing Amigo info-panel override instead of claiming that behavior is fixed.
- Updated the CypherPink frame follow-up so the final contrast fix uses an accessible darker magenta instead of a neutral grey frame.
- Closed legibility as a non-blocking axis: no critical or high issue, one low M5StickV wrapping concern, and no global font-size PR recommended.
- Closed navigation as code-derived evidence. The touch-target guardrail is still a real candidate, but it should wait until active menu/touch PR overlap is checked again.
- Ranked the next implementation work: finish PR #879 first, then revisit a touch-target guardrail if it still does not collide with #771 or #797.
What I found¶
The Amigo follow-up changed the contrast story. The computed ratios suggested that removing the Amigo override would improve contrast, but real-device feedback showed the first draft made the info panels worse. I restored the existing behavior and kept Amigo contrast as hardware-gated follow-up.
Legibility and layout do not outrank contrast. Navigation has useful findings, but the active maintainer PR cluster makes it a poor default authoring lane right now.
Things I noticed¶
- The Week 5 update matters because the PR text, findings pages, and contribution page now describe the same Amigo behavior.
- Simulator evidence is useful, but I need to label it honestly. It cannot prove Amigo behavior by itself.
- The strongest next step is still small: finish the open contrast PR cleanly before opening another area of work.
Next week¶
- Finish PR #879 review and device confirmation.
- Keep the PR body aligned with the restored Amigo behavior.
- Recheck #771 and #797 before planning any touch-target guardrail PR.